The first mile
decides
everything.

Building bankable infrastructure for Bangladesh's circular economy by capturing plastic at the source.

Feedstock target
7,500 t/yr
Displaced Emissions
9,200 tCO2e
System-level EBITDA (USD)

EPR Continuity & Conservative Credit Pricing

Consolidated Unit Economics

Node-level margin analysis and structural cash flows.

Operating Node Economic Role Inflow ($/t) Outflow ($/t) Net Margin
Alpha: Satkhira Loss-Leader Node $250 (EPR Fee) $320 (Remote OpEx) ($70)
Beta: Khulna Hub Profit Engine $930 (rPET + PRO) $680 (Industrial Utils) +$250
Gamma: Cox's Bazar Hybrid Node $280 (CSR + EPR) $220 (Refugee Labor) +$60
Sundarbans Mangroves

Mangrove Alpha

Satkhira Node

Operating as ecological infrastructure. We manage tidal barriers in the Sundarbans to capture multilayer plastics (MLP) before they harm the biosphere.

System Balance
Fund-Subsidized
A structural gap cross-subsidized by system-wide margins to protect the UNESCO Sundarbans.
Revenue Anchor
EPR Compliance
“For us, Blue-Mile is more than recovery. It’s a digital wage and a protected coast for our children.”
Rahima, Interception Specialist, Satkhira

The Hub

Khulna Node

The system engine. Converting high-grade PET into rPET flakes ($750/t), while difficult films are upcycled into energy recovery pathways.

Industrial Yield
2.2x LTV/CAC
Asset Utilization
7,500 t/yr Cap
Industrial Hub

Immutable
Traceability.

Eliminating double-counting with a tamper-proof chain of custody, providing auditable transparency for MNC compliance.

1
Digital Ledger Stamping

Unique batch identifiers from capture to feedstock extrusion.

2
Third-Party Verification

Annual verification against Verra and PCX standards.

Fund Liquidity Audit: Q4 2025
EPR Compliance Capital $1.2M
Material Displacement 9,200 tCO2e
Steady State EBITDA
$840k
Burn to Profit
14 mo.

Scale Roadmap

From infrastructure deployment to systemic equilibrium.

2025: Deployment
Infrastructure

Full installation of Satkhira tidal barriers and the Khulna Hub processing lines. Initial MRV established.

2026: Maturity
Monetization

First voluntary credit trades finalized. 1,200-worker network fully operational on digital wallets.

2027: Exit Readiness
Equilibrium

7,500t scale reached. System self-sufficiency achieved via Beta Hub margins cross-subsidizing the coast.